CONSTRUCTION INSPECTION

Shoal Creek Mall – Building inspection services for materials and components used in construction, the condition of the building regarding problems and unique features and suggestions for corrective actions needed to remedy problems located in Cambridge, Maryland.

Lloyd Street Synagogue - Building inspection services for possible repair solution to existing north and east exterior masonry walls of this existing building located in Baltimore City, Maryland.

Weinberg Woods – Building inspection of four (4) story, 64,490 sq.ft. metal stud bearing wall building.

Redwood Tower Apartments – Inspection services for this eight (8) story apartment complex for A&R Development Corporation located in Baltimore, Maryland.

Lakeside Warehouses, Buildings 1A and 1B - Site review of the structural steel for this two (2) story tilt-up warehouse totaling 135,000 sq.ft. for MIE Properties, Inc.

60 Columbia Corporate Park - Site review of the structural steel including review of bolt torque, visual review of welded connections, Ultrasonic testing of 50% of full penetration welds, plumbness of columns, inspection of floor and roof decks including weld and screw connections, two (2) site visits to steel fabricators shop in Springfield, VA. to review shop practices and ensure welds are completed by certified welder. This project is located in Springfield, Virginia.

Evergreen House - Site review for Johns Hopkins University of retaining wall to determine if the wall can be saved.

Baltimore Street Parking Garage - Construction observation for post-tensioned poured-in-place concrete parking structure located in Baltimore City, Maryland.

344 N. Charles Street - Structural engineering report for a four (4) story structure with basement and partial mezzanine measuring 36' x 118' for Carrollton Bancorp located in Baltimore City, Maryland.

6070 Chesapeake Park Plaza - Property inspection service for Glenn L. Martin State Airport located in Baltimore County, Maryland.

Oak Crest Village Care Center 1 - Inspection services for a four (4) story block bearing wall building, supporting a framed Hambro floor system with a standard wood truss roof for Senior Campus Living located in White Marsh, Maryland.

Oak Crest Village Community Buildings 1, 2 & 3 - Inspection services for a three (3), 50,000  sq.ft. two (2) story steel framed building supporting a framed Hambro floor system with a wood truss roof for Senior Campus Living located in White Marsh, Maryland.

Sinai Hospital Emergency Room Relocation - Site review of a two (2) story, 59,000 sq.ft. reinforced concrete framed hospital addition located in Baltimore City, Maryland.

Brandon Wood Business Center I & II - Phase I: Site review of one (1) single story 42'-0" clear 292,072 sq.ft. warehouse plus an 85,064 sq.ft. storage mezzanine and a 4,697 sq.ft. office mezzanine. Phase II: and one (1) single story 42'-0" clear 352,850 sq.ft. warehouse with a 110,460 sq.ft. storage mezzanine located in Anne Arundel County, Maryland.

Trinity House - Site review of a four (4) story block bearing wall building supporting a precast plank floor with a wood truss roof for Associated Catholic Charities.

Washington Savings Bank - Site review of a five (5) story, 55,000 sq.ft. composite steel framed office building located in Bowie, Maryland.

Burkshire Of Towson - Site review of a two (2) story, 280 car parking facility below 17 floors of apartments and office. The construction of the 340,000 sq.ft. building was composed of a post-tension reinforced concrete slab and cast-in-place concrete columns located in Towson, Maryland.

Owings Mills Parking Garage I & II - Site review of a one (1) three story and one (1) four story post-tensioned beam and slab, 350 car parking facility located in Owings Mills, Maryland for The Rouse Company.

Owings Mills Parking Garage III - Site review of a five (5) story post-tensioned, beam and slab, 1,000 car parking facility located in Owings Mills, MD for The Rouse Company.

Owings Mills Office Building III - Site review of a two (2) story concrete framed slab office building below a seven (7) level steel frame office building located in Owings Mills, Maryland for The Rouse Company.

Commercentre Parking Garage - Site review of a one (1) story, post-tensioned beam and slab, 420 car parking facility located in Reisterstown, Maryland for MacKenzie & Associates. This project received the 1987 Award of Excellence from the American Concrete Institute.

Scarlett Place - Site review of a four (4) story, 300 car parking facility below fourteen (14) stories of residential condominiums located in Baltimore City, Maryland. The construction of the 400,000 sq.ft. building was composed of a post-tension reinforced concrete slab and cast-in-place concrete columns for Merritt.

Burdick Garage - Site review of a five (5) story, 1000 car precast concrete parking garage at Towson State University, Towson, Maryland for Mullan Enterprises, Inc.

Belvedere Green - Site review of a four (4) story, precast concrete plank with masonry bearing wall residential structure in Baltimore City, Maryland for Associated Catholic Charities.

Suisse Chalet - Site review of a five (5) story, precast concrete plank with masonry bearing wall hotel in Howard County, Maryland for Suisse Chalet International.

50 Columbia Corporate Center - Site review of a seven (7) story, composite beam steel framed office building in Columbia, Maryland for The Rouse Company.

Belt's Wharf Condominium - Site review of an eight (8) story, post-tensioned flat plate condominium totaling 210,000 sq.ft. located in Baltimore City, Maryland for Frank F. Favazza & Son.

Morgan State University/Blount Hall - Site review of an eight (8) story, 155,000 sq.ft. precast concrete plank with masonry bearing wall dormitory for Thomas P. Harkins/A & R Joint Venture located in Baltimore City, Maryland.

Mercy Medical Center - Site review of a nine (9) story, 85,000 sq.ft. steel framed office building in Baltimore City, Maryland for Mercy Medical Center.

Towson Run Apartments - Site review of a seven (7) story, concrete framed dormitory located at Towson State University for Mullan Enterprises

Redwood Parking Garage - Site review of an eight (8) level, 800 car parking garage located in Baltimore City, Maryland for A & R Development.

Church Home Hospital Garage - Site review of a three (3) level, concrete framed parking garage located in Baltimore City, Maryland for Whiting/Turner Contracting Company.

Union Memorial Hospital - Site review of an eight (8) story, 175,000 sq.ft. multipurpose building and garage located in Baltimore City, Maryland for Mullan Enterprises.

Preston Court Warehouse - Site review of a single story, 120,000 sq.ft. tilt-up concrete warehouse with a structural steel bar joist roof for FRP Development Corporation.

Westminster at Lake Ridge - Site review of a five (5) story, 210,000 sq.ft. post-tension flat plate residential building.

Villa Julie College - Site review of a three (3) story, 50,000 sq.ft. steel frame academic building with a 392 seat composite steel frame auditorium, and a 24,000 sq.ft. gymnasium with a 20,000 sq.ft. mechanical penthouse.

Charlestown Health Center - Site review of a four (4) story masonry bearing wall with Hambro framed floor and wood truss roof.

Charlestown Corporate Office Building - Site review of a two (2) story steel frame building with a Hambro framed floor and a wood truss roof.

Johns Hopkins McElderry Street Garage - Site review of a four (4) story, 250 car, post-tension parking garage for Johns Hopkins University located in Baltimore City, Maryland.

Johns Hopkins School of Medicine Parking Garage - Site review of a five (5) story, 600 car, post-tension parking garage for Johns Hopkins University located in Baltimore City, Maryland.

Petroleum Fuel Terminal - Field investigation and report of twelve (12) existing building consisting of one (1) and two (2) stories plus renovation of exposed structural elements.